Minimum amount 5 feet separation is needed in between non permanent indications, along with a five toes assets line setback is needed; nevertheless, momentary signals are allowed on present permitted structures that don't meet the 5 feet setback, for instance a fence. Temporary indicators cannot be located in the general public proper-of-way.One th